====== Overall ToDo List ====== * Deal with motorcycle tire * Abe: the 2nd thing was to look thru the spreadsheet I sent to identify the Legacy Gateways which came over with us to IBM. Then to get connected with Sambit Dash &/or Surendra Allu to have them get started producing the two artifacts which are required with "Signature" applications (the Legacy Gateways are considered Signature). I sent the templates for the artifacts in an email on Friday morning before the meeting. * The CCDW simulator ran out of memory in ITV2 when running with the ENSEMBLE_20150421100000.CSV file (with 1.7 million records). The simulator ran OK on my workstation. The work-around was to process only the first 1000 records from the file (named ENSEMBLE_20150421100001.CSV).