User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
todo [2015/04/14 15:04]
dwheele created
todo [2016/06/10 00:25] (current)
admin ↷ Page moved from dan:todo to todo
Line 3: Line 3:
   * Deal with motorcycle tire   * Deal with motorcycle tire
   * Abe: the 2nd thing was to look thru the spreadsheet I sent to identify the Legacy Gateways which came over with us to IBM.  Then to get connected with Sambit Dash &/or Surendra Allu to have them get started producing the two artifacts which are required with "Signature" applications (the Legacy Gateways are considered Signature).  I sent the templates for the artifacts in an email on Friday morning before the meeting.   * Abe: the 2nd thing was to look thru the spreadsheet I sent to identify the Legacy Gateways which came over with us to IBM.  Then to get connected with Sambit Dash &/or Surendra Allu to have them get started producing the two artifacts which are required with "Signature" applications (the Legacy Gateways are considered Signature).  I sent the templates for the artifacts in an email on Friday morning before the meeting.
 +  * The CCDW simulator ran out of memory in ITV2 when running with the ENSEMBLE_20150421100000.CSV file (with 1.7 million records). The simulator ran OK on my workstation. The work-around was to process only the first 1000 records from the file (named ENSEMBLE_20150421100001.CSV).
 +
todo.1429023879.txt.gz · Last modified: 2015/04/14 15:04 by dwheele